Zephyr BVE-E36AS Guide d'installation Page 12

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 66
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 11
1. Remove filters
2. Remove cover from junction box to
gain access to electrical wiring.
3. If using a cable lock, pry open the
desired electrical knockout either on
top or back of hood. Feed the wires
through the cable lock. Some local
codes require the use of a cable lock,
check your local codes.
4. If using hood in air recirculating
mode skip steps 4 and 5.
Pry open desired ducting knock-out
either on top or back of hood.
5. Remove starting collar from inside
hood body and secure 3-1/4” x 10”
rect. starting collar to the top or rear
duct opening using (10) M3.5x12
screws.
5. Remove starting collar from inside
hood body and secure 6” round start-
ing collar to the top duct opening using
(10) M3.5x12 screws.
Installation – Preparing Electrical and Ducting
10
Vue de la page 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 65 66

Commentaires sur ces manuels

Pas de commentaire