Zephyr BVE-E36AS Guide d'installation Page 12

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 22
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 11
Installation – Preparing Duct Location
10
www.zephyronline.com
Note: If using hood in recirculating mode skip these steps and turn to page 11.
Vertical Ducting
(7" Round)
Vertical Ducting
(3-1/4"x10" Rectangular)
1. Using a at-head screwdriver, remove both the
rectangular and round knock-out plates located on
top of hood
1. Using a fl at-head screwdriver, remove only the
rectangular section of the knock-out plate located
on top of hood.
1. Using a fl at-head screwdriver, remove the
rectangular knock-out plate located on back of
hood.
2. Secure 3-1/4" x 10" rectangular collar to top of
hood using (6) M4 x 8 screws.
2. Secure 3-1/4" x 10" rectangular collar to back of
hood using (6) M4 x 8 screws.
2. Secure 7" round collar to top of hood using
(6) M4 x 8 screws.
Horizontal Ducting
(3-1/4"x10" Rectangular)
16
25
34
1
6
2
5
3
4
1
6
2
5
3
4
Vue de la page 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 21 22

Commentaires sur ces manuels

Pas de commentaire